
Make EV charging part of what your development offers.
Scalable, well-designed EV charging infrastructure for premium residential projects — installed right during construction, maintained long after handover.
EV charging is becoming a buying criterion. Here's where most residential projects fall short.
EV CHARGING IS NOW A BUYER QUESTION
Buyers increasingly ask about charging at the site visit. Developments that don't offer it are losing ground to those that do — especially in the premium segment.
Infrastructure that adds value at launch and zero burden after handover.
Sustained performance, extreme conditions
High-efficiency hardware built to run reliably for the life of the building, not just the warranty period.
Right infrastructure, right stage
Scalable design — conduit and wiring laid during construction, chargers added per bay as demand grows, protecting the developer's upfront investment.
Individual metering and billing
Per-charger metering ensures fair, transparent cost allocation whether billed by the developer, society or resident.
Quality through in-house manufacturing
Long-life hardware with warranty terms suited to a residential asset maintained by a society committee, not a technical team.
Handover-ready AMC
Maintenance contract designed to transfer from developer to society at project completion, with remote monitoring and local support continuing uninterrupted.
End-to-end delivery
Turnkey EPC coordinated around the construction programme — design, supply, installation and commissioning.
Recommended for your development
A selling point at launch. Zero liability after handover.
Buyers notice. And they ask.
EV charging is a tangible feature that comes up at site visits. Offering it — well-installed and well-branded — supports premium pricing and helps close decisions faster.
Get it right during construction, not after
Wiring and conduit laid during construction costs a fraction of retrofitting in a finished, occupied building. The time to plan it is before the slabs are poured.
Hand over an asset, not a headache
AMC transfers at project completion — the developer hands over a working, supported charging setup, not a vendor relationship for the society to figure out.
Every resident pays for what they use
Per-charger metering means no shared billing disputes from the moment the society takes over.
Hardware that lasts
In-house manufactured components and a multi-year warranty reduce the risk of early replacement or society-funded remediation.




